Blog

Power Station

During the summer stop of the hydroelectric plant in La Paraya, Somfer made the electrical installation of the new load chamber. In addition of the electrical installation of the diferent electric equipments, Somfer has developed the electrical and control engineering, integrating different equips and the measurement signals needed for the good operation and control of the hydroelectric plant. This system allow the control of the load chamber and its running parameters through a SCADA remote control too.

The link between load chambre and hydroelectric plant has been made by fibre optic, connecting the PLC located in the general electric cabinet with a remote station installed in the secondary electric cabinet designed for that purpose and installated in the main electrical central.

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies